They lost a sale I guess.
They could have made €8 off you but are holding out for €25 or €30 they’ll never get from you.
Proper order too. Will you remonstrate with the lackeys in TechStar the next day you’re there? I would explain to them how retail actually works.
Jesus, they’d have some laugh when you left ![]()
Mostly LIT (TUS) students I’d say , trying to make a few bob.
I’d normally try to shop local but that was too big a gap.
You’d definitely get it in ‘town’ for the fifteen I’d say.
I’m predicting a 30 billion cost for this
I’m predicting a grand shelving
Metro link is in a race against the recession
Ah shur look it, we tried, and thats all that matters.
How much luas would you get for 13bn I wonder
God, the costs under this Government are completely out of hand. Madrid is building 7km of underground metro with five stations for about €744 million, while our 18.8km MetroLink could cost €19 billion and people are even talking about €30 billion.
The Spanish would probably deliver the whole thing for €3–€5 billion, and China for less again.
We’ve somehow normalised paying several times the international price for every major project.
The scale of this is absolutely obscene. For the €19–€30 billion being talked about for less than 19km of MetroLink, we could restore the Galway–Tuam–Claremorris–Sligo railway, build a new line from Sligo into Donegal, and construct an entirely new north western route branching from Portadown through Armagh, Monaghan and Omagh to Letterkenny, giving Donegal proper rail connections to both Dublin and Belfast. Even at a very generous €30–€40 million per kilometre, we could build hundreds of kilometres of regional railway for less than this one short Dublin line.
Madrid builds underground metro for about €106 million per kilometre; we’re heading towards €1 billion per kilometre. This isn’t normal inflation, it’s a State that has completely lost control of infrastructure costs.
Phrases such as ‘careful consideration’ and ‘current instabilities’ are sure to be used….
I had a flat white this morning in Day n Night on Great Denmark Street cc @binkybarnes . It was €3.20. That’s good going. €4 seems to be the going rate now.
The scale of a big project is obscene?
We should sub it out to the Spanish
The price of it is obscene. I’ve already pointed out that, for less than the cost of this short Metrolink, you could build rail connections from Portadown to Letterkenny and from Galway through Sligo to Letterkenny benefiting most of Connacht, the northwest and Donegal.
You may disagree, and that’s fair enough, but I see very little value in spending up to €19 billion on less than 19km of railway when an overground Luas or improved connection could do much of the job.
I use the airport bus regularly and rarely experience any serious delay.
The alternative I’ve outlined would transform an entire region and deliver vastly more bang for the taxpayer’s buck.
In my opinion, spending that kind of money for such limited gain is obscene
€7 for a pint of Guinness 00 in Vicar Street last week.
I was driving, my mate was drinking so I thought if more sociable to drink the 00.
The National Children’s Hospital.
We now don’t have any date for substantial completion.
Micheál Martin was on last week about having to protect the taxpayer. That day is long gone - just get it open.
We are completely at the mercy of BAM. Surely the NPHDB have to be on the hook for this.
I thought this was half built