I was never stronger
Ah ya I was an animal after it and ating a breakfast roll a day
50 quid a day. Those lads had no idea what they were earning. I’d a plasterer subbie from west galway doing the houses in Doonbeg GC. He never invoiced the last two houses. About 25k each. He Took two finished houses as payment for a housing scheme from McCarthy’s in Ennis.
I got caught for a cunt of a job. I had to chase out a line in a reinforced stair well wall. I’d a half a scaffold so I’d the kangoo above my head for a day or two.
I’d be going home on the bus for a few days and it felt like my arms were lifting above my head
They were crazy times, name your price and you’d get it. Still can’t get a fella to do a job mind
A breakfast roll at 7. A chicken roll at 11. A dinner out of a box at 5. And a nice supper at 9.
And about 15 cups of tea throughout the day.
Our biggest concern pricing a job was always would you be able to get a blockie and plasterer to do the work. Worse still if you were in limerick and had to deal with unions. 1.50 a block and if they didn’t do enough in the day you had to pay them 250 for the day regardless. A lot of the time they were happy with their 1250 a week and didn’t do a tap. Lost a ball of money on that rice’s corner job in limerick because of them.
Are any of the polish contractors making a dint in big sites? I know they’re getting a lot of the small jobs and undercutting lads.
We had a polish lad do a few jobs for us and he was brilliant.
It’s 12 years since I did a job in Ireland, back then the polish and Latvians were the most reliable lads we had.
Urquell & throw up a photo of that spare stone and we will think about helping
The fella we had recently had two lads subbing with him. My jesus if they left down a tool for 30 seconds he was on them like a thirsty man on a pint.
I was very impressed
They appreciated the money was the biggest difference.
Sometimes if money is the goal the quality is sacrificed.
The BATU lads in Limerick were dangerous cunts. Some boys to shut down a site.
Small shutter, square it up and order the concrete, not a whole lot of work in that tbh but if your useless with a hammer and saw get a lad to do the shutter for ya, will need fuck all if any steel with the size of it and you prob would get away without using a poker as its small. Min 4 inches… You putting a path or anything around it
Nah it’ll be astro around it so won’t need a path I reckon. I’ll have a cut off weekend after this. Should be worth a nice post if nothing else
Rent or borrow a whacker before ya pour… Best of luck with it
Before launching into a serious effort and time look up a crowd called “the shed factory”.
My daughter got a smashing galvanised shed 8’X10’ delivered and erected for €895 last year. Her’s is a wood effect colour and comes floored. I subsequently covered the floor with laminate for durability. You’ll need 10/12 concrete blocks as they level and build the shed off the ground on them. A grand tidy job. Worth a look at the price.
I wouldn’t be gone on them now.