Knowing how Paddy does things, that would probably be the cost alrightâŚ
The consultants fees maybeâŚ
They will be joined up. Itâs just a matter of when.
For an extortionate price
This phase of works was announced first day as a phase 1 that would only cover the 7km between the two interchanges. The interchanges are clearly marked on the map above. Not sure why the councillors are only realising this now (actually I do know why), but they should have been on this a lot earlier. This is the press release from the time of the announcement.
Project Overview:
The Adare Bypass Phase 1A of the overall Foynes to Limerick Road (including Adare Bypass) Project, will extend between the new interchange junctions at Adare and Croagh.
It includes:
- Approximately 7 km of new motorway from Croagh to Adare;
- Two grade-separated junctions at Adare and Croagh;
- Associated connections to and realignment of existing National, and Local roads;
- Over 200m long 3-span bridge with a central clear-span of approximately 95m over the River Maigue at Adare;
- Four river bridges; three signage gantries; seven overbridges/underbridges; and various accommodation underpasses, retaining walls and culverts;
- Extensive earthworks; various drainage works including provision of attenuation ponds and wetlands various accommodation works, side roads and accesses; and various ancillary works;
- Various authority and utility diversions include the diversion of electricity, phone, broadband, and water apparatus.
The Adare Bypass also includes two new railway bridges, over the Foynes to Limerick railway line currently being recommissioned. IarnrĂłd Ăireann is delivering these bridge works in conjunction with John Cradock Ltd on behalf of Limerick City and County Council.
it takes 30 mins to cycle through Adare?
Do you know many people who commute from West Limerick to the city on their bikes
I dont know anybody from limerick mate
Arnt you lucky !
Then why are you commenting on a limerick thread
Its an anti cager thing mate
Are you new around here?
Opened today on budget and on time.
https://www.rte.ie/news/munster/2025/0522/1514230-brian-boru-bridge/
Sisk are around a long long time, didnât they build croke park ?
Why it took so long, Iâve no idea. Trying to cross the main road there is a nightmare. Any busy junction like that should automatically have a roundabout.
Badly needed.
I wouldnât be taking the second exit on it though.
I wouldnât wish Charleville on my worst enemy
Unless youâre trying to stalk the lovely Valerie itâs generally wise to give Charleville a miss