Major ground works will start next week as part of the preparation for Metrolink.
Trenches are being dug at the Estuary Roundabout of the R132 on Wednesday and Thursday (05/04 and 06/04). Traffic will be reduced to one lane in the area.
Theses trenches being dug along the route of the Metrolink so that engineers can exactly map the location of utilities prior to the dig.
Similar trenches are also being dug on local roads around the area between now and May.
In the coming weeks a trench will be dug on the Seatown Roundabout and a stop go will be put in place to manage traffic
Circle line for Dublin. Red line heading through the port to Poolbeg, Grand Canal Dock and then along the Grand Canal out to Heuston.
I don’t see the space in the city centre unless we tunnel under College Green or St Stephen’s Green. Ideally you could do a straight shot from Poolbeg/Ringsend up by Pearse Street, Dame Street and onto Heuston. That would basically be DART Underground in terms of inner city connectivity which isn’t going to get built.
Spencer Dock station is being rebuilt as part of DART+. In time it will be taking DART+ West and South West. Alongside the new Heuston DART platform, it is arguably the most important piece of the project (aside from Glasnevin station which also forms a part of the Metro Link project) and will be a very important station in the decades ahead.